Tuesday, August 30, 2011

Bathroom

For this bathroom remodel, James custom made a cabinet for behind the toilet.

He also framed the mirror to match with a small shelf.

Here is the installed cabinet.

Installed mirror, new sink and fixtures.


All new tile and bathroom fixtures installed.

The custom built shower with seat replaced the old bathtub.

No comments:

Post a Comment